Thursday, September 27, 2012

Birthday Boy!

I can't believe that Dylan is already a year old. What a big boy, well old anyway, he's still a little guy. I'll put in some more details on his year in another post, this one is just his birthday party. He had chocolate cupcakes, got some cars, a helicopter, and a walker. He started to walk with it right away. He loves cars, or anything with wheels. He almost always has a car with him that he's pushing around. He was so surprised that he got his own cupcake. He loved the candle on top. He had so much fun squishing his cupcake, he didn't like to eat it. He had a fun party and it was so nice that he got to have his brother and sister here for it.























We have so many birthday's in the summer. Mine is in July, and Dylan, Brenden's, and Ben's is in August. We have our anniversary in August so it's a party month for us. We gave Brenden and Sarah their birthday presents at Dylan's party. Brenden got a cool Lego set he picked out at Legoland. Sarah got a princess dress up set, a cowgirl hat, and some makeup. We had such a fun birthday party.



  



Wednesday, September 26, 2012


Hoover Dam



 Hoover Dam is one of my favorite places to visit. My Grandpa built dam's and coming to visit always reminds me of him. So Hoover Dam holds a special place in my heart, and I love that we live close enough to visit often. We came to visit when Dylan was three weeks old, and came a few times this summer with Brenden and Sarah. I loved watching the progress on the bridge, and am always impressed by the amazing view. At the end of the summer we met with Brooke to take the kids back to Texas for the school year. Such a sad day for us. We took a tour of the power plant and had a fun time learning about Hoover Dam. While we were on the tour a lady took our picture and commented that we would need proof for Dylan to remember that he got to visit Hoover Dam. I smiled and didn't mention that we come several times a year. Hope you enjoy the pictures.






















































The looks I get when I'm trying to get a picture.


 Some of the the facts we learned while taking the tour.

Chief dam engineer Frank T. Crowe lived up to his nickname, “Hurry Up” Crowe. The dam was completed two years ahead of schedule, in 1935.

Hoover Dam is 726 feet high, 45 feet thick at the top and 660 feet at the bottom, and is larger than the Great Pyramid of Cheops.

Hoover Dam is filled with 3.25 million cubic yards of concrete, enough to pave a strip 16 feet wide and 8 inches thick from San Francisco to New York City.

If the heat produced by the curing concrete could have been concentrated in a baking oven, it could have baked 500,000 loaves of bread per day for three years.

Dam workers improvised hard hats by coating cloth hats with coal tar. The hats were so good at protecting the worker’s heads that Six Companies, the contractor, ordered commercially made hard hats of this same design for every man.

The lowest wage for a Hoover Dam worker was 50 cents an hour. The highest, $1.25.

High scalers, the workers who hung from ropes on the canyon walls as they drilled with jackhammers and packed dynamite, included circus acrobats, among others.

Sometimes for fun when the foremen weren’t looking, high scalers would swing out from the canyon walls and perform stunts for the workers below.

From the Nevada side of the dam you can see the silhouette of a World War II gun emplacement standing on the Arizona side of Lake Mead. A major source of power for the defense industry, 
Hoover Dam was considered a primary military target.

On the wall across from the escalator to the dam tour is a plaque dedicated to the Hoover Dam mascot, a stray dog who “adopted” the dam and its workers. He is buried nearby.

Hoover Dam is named for Herbert Hoover, the nation’s
31st president. After he left office, the names “Boulder Canyon Dam” and “Boulder Dam” were frequently used, allegedly because the new Secretary of the Interior did not like the former president.

Two winged figures, 30 feet tall and made of bronze, stand on the Nevada side’s approach to the dam. Legend has it that rubbing their toes brings good luck.




The winged figures rest on a black marble star chart that represents the stars’ positions on the day the dam was dedicated, September 30, 1935.

On the dam tour, you can see gleaming terrazzo floors imbedded with Southwestern Indian designs adapted from baskets, pottery, and sand paintings by Italian craftsmen.

Boulder City, formerly the town where dam workers were housed, still does not allow gambling within town limits, a regulation imposed in the 1930s. Boulder City is the only town in Nevada to prohibit gambling.
On their time off, exhausted dam workers would often go to the Boulder City cinema, one of the two buildings with air conditioning. Most of them slept through the movies.

The bypass bridge, located approximately 1,500 feet south of the dam, is 1,900 feet long. The arch span stretches 1,060 feet, and the deck stands 900 feet above the river. The bridge’s pedestrian walkway will give visitors expansive views of Hoover Dam, Black Canyon, Colorado River and Lake Mead.
It was dark and hot, I think he was a little nervous. I love the expression, it makes me smile.

The total cost of the bypass bridge is $240 million, $100 million in federal funds, $20 million each from Nevada and Arizona, and $100 million in state bond funds. Of the approximate $130 million in bond funds ($100 million plus interest), advanced by the two states, about $96.32 million has been repaid.


Hot and tired baby boy.
















Lilypie Premature Baby tickers

Lilypie Premature Baby tickers